New Build Snagging Checklist: Room-by-Room Inspection

A snag is any defect the developer should fix before you accept your new-build home, and the day of handover is your best chance to catch them. This checklist walks you through every area room by room: walls, ceilings and floors, windows and doors, the kitchen, bathrooms, heating, water and electrics, the loft, garage and outside, and the certificates and warranties to collect before you sign off. Enter your email to unlock the full list here and we'll send a printable PDF copy to take on site. Photograph every defect and submit your list to the developer in writing.

49 checks, 7 areas, emailed as a PDF to take to your handover

A room-by-room inspection list for new-build snagging: every room, windows and doors, kitchen, bathrooms, heating and electrics, loft, garage and outside, plus the paperwork to collect before you sign off. Enter your email and we'll unlock it here and send you a printable PDF copy.

Every room (walls, ceilings, floors)Windows & external doorsKitchenBathrooms & en-suitesHeating, water & electricsLoft, garage & outsidePaperwork before you sign off

One email, no spam: the checklist and occasional new-build buying guides. Unsubscribe any time.

This check runs on screen, no signup. The full property report is £9.99 Lite / £24.99 Complete. One report, one price, no subscription.

Cancel for a full refund at any time before your report is emailed. Terms

  • One-off

    No subscription

    Pay once for each report you buy.

  • Named

    Sources & coverage

    Every report names its sources and the checks it could not run.

  • GB

    England, Wales & Scotland

    Coverage varies by nation and source, and is stated.

  • £9.99

    Reports from

    Lite £9.99, Complete £24.99.

From this free check to the full report

The free tool answers one question. The report covers the whole address.

  1. No signup

    Use the free tool

    Run the tool above. The answer shows on this page, with nothing to sign up for.

  2. Before you pay

    Pick the house and the report

    Choose the exact address, then Lite (£9.99) or Complete (£24.99). One-off, no subscription.

  3. Emailed within 24 hours

    Get the full report

    The report for that address is emailed to you, with every source named and any check it could not run stated.

Frequently asked questions

What is snagging on a new build?
Snagging is the process of inspecting a newly built home for defects, from cosmetic issues like uneven paintwork and poor sealant to functional faults like doors that won't close, leaking pipes or a boiler that wasn't commissioned properly. You list the snags and the developer is responsible for putting them right, usually within a defined period after completion.
When should I do my snagging inspection?
Ideally at or just before legal completion, and again in the first weeks of living there as more issues surface (some only show once the heating runs or after settling). Many buyers do a thorough inspection on handover day and submit the list straight away; you can also commission a professional snagging inspection, but this checklist covers what most buyers can spot themselves.
How do I report snags to the developer?
In writing, dated, with photographs of each defect and its location. Email is ideal so there's a record. Ask the developer to confirm a timescale for the fixes in writing too. Keep your build warranty (NHBC, LABC or similar) details to hand, as they set out your rights if issues aren't resolved.
Is a snagging checklist the same as a survey?
No. Snagging catches the builder's defects on a brand-new home. A survey assesses the condition of an older property, and neither looks at the risks around the plot: flood zones, ground stability, radon, or what comparable homes actually sold for. Those are a different check: our house check reads them from official data for any UK address.

Check the whole address

Search an address in England, Wales and Scotland, see the available area data, then choose an emailed report for the property.

Type the full address with its postcode to go straight to your report options. Try .

Cancel for a full refund at any time before your report is emailed. Terms

Still have a question? We typically respond within 24 hours.

Last updated: